Maintenance will begin at 6 p.m. on Friday, July 18, and is expected to conclude by approximately 7 a.m. on Monday, July 21. During this time, document upload for online forms will be unavailable, and the website and search functionality may be intermittent. We appreciate your patience.

La maintenance commencera à 18 h le vendredi 18 juillet et devrait prendre fin vers 7 h le lundi 21 juillet. Pendant cette période, les téléversements de documents pour les formulaires en ligne ne seront pas disponibles et il se peut que le site Web ainsi que la fonction recherche ne fonctionnent que de façon intermittente. Nous vous remercions de votre patience.

Google Translate Disclaimer

A number of pages on the Government of Saskatchewan's website have been professionally translated in French. These translations are identified by a yellow box in the right or left rail that resembles the link below. The home page for French-language content on this site can be found at:

Renseignements en Français

Where an official translation is not available, Google™ Translate can be used. Google™ Translate is a free online language translation service that can translate text and web pages into different languages. Translations are made available to increase access to Government of Saskatchewan content for populations whose first language is not English.

Software-based translations do not approach the fluency of a native speaker or possess the skill of a professional translator. The translation should not be considered exact, and may include incorrect or offensive language. The Government of Saskatchewan does not warrant the accuracy, reliability or timeliness of any information translated by this system. Some files or items cannot be translated, including graphs, photos and other file formats such as portable document formats (PDFs).

Any person or entities that rely on information obtained from the system does so at his or her own risk. Government of Saskatchewan is not responsible for any damage or issues that may possibly result from using translated website content. If you have any questions about Google™ Translate, please visit: Google™ Translate FAQs.

Regina Bypass Project

A map of the City of Regina with the route of the Bypass highlighted

The Regina Bypass was built to improve driver safety, improve a key component of the National Highway System, reduce traffic congestion in and around Regina, and, increase efficiency for truckers and shippers moving goods.

The need for a bypass was identified in the 1990s. Public and stakeholder consultation was a priority throughout the study process. The route selected received approval from the City of Regina, Balgonie, White City, Pilot Butte, Emerald Park, Edenwold and the Rural Municipalities of Sherwood and Edenwold.

Work on the project started on July 29, 2015. The project was complete on October 28, 2019. The Regina Bypass opened to the public on October 29, 2019.

The Regina Bypass was built as Public-Private Partnership (P3). With a P3, the team that builds the bypass must maintain it in "like new" condition for 30 years. This includes but is not limited to:

  • Surface repair;
  • Pavement marking;
  • Repairing and replacing signs;
  • Bridge/culvert repair;
  • Ditch mowing, snow clearing, weed control, garbage pickup;
  • Drainage control;
  • Lighting and power costs;
  • Acquisition of equipment, facility and staff.

Regina Bypass Partners

We need your feedback to improve saskatchewan.ca. Help us improve